78 COLLECTIVE HOUSING AND COMERCIAL CENTER, LA TENERÍA. PINTO
The general assembly is conditioned by the provision of commercial premises at ground floor. these occupy approximately one third of the surface of the parcel. The rest of the plot is a unitary enclosure with a single access, via the existing square. The housing program is resolved into four independent blocks which have the access inside the plot. Two of the blocks have an identical program of 19 houses each, two and three bedrooms and are developed on the ground floor, three floors plus an attic. The third block with 17 houses of two and three bedroom apartments in a distribution similar to that of the previous blocks, differing in having ground floor access to the residential garage. The façades are raised based on prefabricated concrete panels. The holes are protected from direct solar incidence by horizontal slat blinds, canopies and overhangs, so that the solar contribution is controlled in the most exposed facades.

YEAR 2006
tipology: Collective Housing
situation: Avd. Antonio López, La Tenería. Pinto. Madrid
client and management: Inmobiliaria Egido S.A.
construction: Constructora de Pinto
surface: 2.300m2
budget: 5.9 M€

[ESPAÑOL]

NEXT